TO OPERATE ON HILLS
OPERATION
The slowest speed possible should be
used before starting up or down hills.
Avoid stopping or changing speed on
hills.
If stopping is absolutely necessary, pull
drive levers into the neutral position and
push to the outside of the unit and
engage the park brake.
To restart movement, release the park
brake.
Pull the control levers back to the center
of the mower and press forward to
regain forward motion.
Make all turns slowly.
TO TRANSPORT (See Figures 6 & 6A)
When pushing or pulling the mower, be sure to
engage the EZT (E-Series Zeroturn Transaxle)
bypass linkages. The EZT bypass linkages are
located on the rear of the frame, below the rear
engine guard.
FIGURE 6
EZT BYPASS
LINKAGE IN
BYPASS POSITION
FIGURE 6A
HEAD OUTSIDE
CAUTION
Do not tow this vehicle, it may cause dam-
age to the drive system.
Raise the deck into the highest cutting
position.
Pull the EZT bypass linkages out and into
the slots and release so that it is held in
the bypass position.
To reengage the EZT's to drive, reverse
the above procedure.
16