22– English
50
100
Page
Maintenance interval
in hours
MAINTENANCE
25
Maintenance
Daily
mainte-
nance
before start
● = Described in these instructions.
❍ = Not described in these instructions.
WARNING!
No service procedures must be conducted on the engine or cutting unit unless:
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.
1) First change after 5 hours. Replace after every 25 hours with heavy loads or high temperatures. 2) During dusty conditions cleaning and
replacement should be more frequent. 3) For daily use of the machine lubrication should be conducted twice a week. 4) Conducted by
authorised service workshop.
Cleaning 23 ●
Check the engine’s oil level 39 ●
Check the engine’s cooling air inlet 32 ●
Check the fuel pump’s air filter 30 ●
Check the steering wires 26 ●
Check the brakes 27 ●
Check the battery 30 ●
Check the safety system 31 ●
Check screws and nuts – ❍
Check for fuel and oil leakage – ❍
Clean around the silencer – ❍
Inspecting the silencer 25 ●
Change the engine oil
1)
39 ●
1)
●
1)
Clean the air filter’s pre-filter
2)
29 ●
Check the cutting unit 33 ●
Check the tyre pressures (60 kPa / 8.5 PSI) 32 ●
Lubricating the belt adjuster
3)
40 ●
Lubricate joints and shafts
3)
40 ●
Adjust the brakes Rider 11 and Rider 11 C 27 ●
Check the V-belts – ❍
Check the transmission’s cooling flanges
Rider 13 C and Rider 15 C – ❍
Check the transmission’s oil level
Rider 13 C and Rider 15 C 40 ●
Adjust the brakes Rider 13 C and Rider 15 C 27 ●
Check and adjust the throttle wire 28 ●
Clean the cooling flanges on the engine and – ❍
transmission
2,4)
– ❍
Replace the air filter’s pre-filter and paper filter
2)
29 ●
Replace the fuel filter 28 ●
Replace the plug 30 ●
Check the valve clearance
4)
– ❍
• The engine is switched off.
• The ignition key is removed.
• The ignition cable is removed from the plug.
• The parking brake is applied.
• The cutting unit is disengaged.