Dynasty Spas Elite System D-3000 Hot Tub User Manual


 
Priming Pump For Electric Packs
Turn off power at the breaker
It is important to make sure that all of the air is out of the equipment pack
before operating. To do this follow procedures below:
The Power pack system is located under the wood skirt. The equipment
can be serviced by simply opening the doors.
Set thermostat, located on top side control panel to desired temperature, and
continue heating until desired temperature has been reached. Depending
on equipment, this will normally take 8 to 10 hours.
Make sure the gate valves are open
Fill the spa with water going thru the filter
Turn the power on at the breaker
Start the pump on Hi-Speed and water will start circulating within
one to two minutes. (The pump is self-priming). If water does not circulate,
turn off the power and make sure all gate valves are open if so equipped.
Restart the pump. Within one to two minutes, it should be primed
General Pre-Operation Instructions
WARNING: Do not run spa with gate valves closed or run pump with
no water circulating in spa for long periods. This could damage
the spa equipment.
Air Blower
Ozonator
(Optional)
Equipment Pack
Gate Valves
Flow Thru
Heater
Circulation
Pump
(Optional)
Auxiliary Pump
(Optional)
2 Speed
High Performance
Pump