4
CROSSBAR MOUNTING BRACKET INSTALLATION
JOIST
CEILING
WIRING
CROSSBAR
MOUNTING
BRACKET
FLAT
WASHER
GREEN
GROUND
WIRE
CEILING FAN
APPROVED
WIRING BOX
RIDGE
SIDE
DOWN
APPROVED
OUTLET BOX
HARDWARE
Note: After removing the old fixture, check the outlet box
to insure that it is supported by a joist or beam across its
upper surface. If not, a 2” x 4” stud must be installed.
Step 1.Removetheknockoutpluginthecenteroftheout-
letboxordrilla
1
/2″ hole for the lag screw to pass through.
Then drill a
1
/4″ guide hole into the joist or beam to a depth
of 3″.
Step 2. Routetheoutletboxwiresthroughthekeyholeslotof
the crossbar mounting bracket as shown. Attach the crossbar
mountingbrackettooutletboxwithscrewsprovided,assuring
thattheoutletboxwiresarenotpinchedbythewasher.
CAUTION: To reduce the risk of personal injury,
use only the mounting hardware provided with
the approved outlet box to install the crossbar
mounting bracket.
WARNING!
SUPPORT DIRECTLY TO
BUILDING STRUCTURE ONLY.
Step 3. With the large washer attached, pass the lag screw
through the center hole of the crosbar mounting bracket
andscrewintoguidehole.Tightenuntiloutletboxisrmly
mountedtobeam.Thisboxmustbermlysecuredtothe
ceiling.Werecommendthattheceilingxtureoutletbox
be of sufficient capacity enabling it to support the weight
offanandlightxtureunderanyconditions.
LAG
SCREW
LAG SCREW INSTALLATION
LARGE
WASHER