Section 3. TLX106 Instrumentation Installation
3-9
- RCV (white)
- RCV (black)
+ RCV (green)
+ RCV (red)
+ XMT (red)
+ XMT (green)
- XMT (black)
- XMT (white)
- RCV
+ RCV
+ XMT
- XMT
BLACK
RED
GREEN
WHITE
2
1
3
4
- RCV (black)
+ RCV (red)
+ XMT (green)
- XMT (white)
2
1
3
4
SRM-5A
Surge
Protector
PC
User
Supplied
Cable
Splices
ET106 ENCLOSURE
ET106 ENCLOSURE
To # 8
External Connector
Earth Ground
CAMPBE
SCIENTIIC TD
SC932 - SN E155
C
FIGURE 3.3-3. Short-Haul Modem Wiring Diagram
3.4 Sealing and Desiccating the Enclosure
The TLX106 Enclosure is supplied with a desiccant pack. The desiccant
maintains a low humidity in the enclosure to minimize the chance of
condensation on the instrumentation. Desiccant should be changed when the
internal TLX106 Enclosure humidity sensor measures 30% or higher. Install
the desiccant as shown in Figure 3.4-1. Keep unused desiccant tightly sealed
in an airtight container.
1) Take the desiccant pack out of its sealed plastic bag. Place it under the
desiccant strap just before leaving the station.
2) Be sure to close the enclosure hasp securely. A padlock may be used on
the latch for extra security.
TLX106 ENCLOSURE
TLX106 ENCLOSURE