Bush Hog PT5 Cultivator User Manual


 
OPERATION
PT5 09/10 Operation Section 4-14
© 2010 Alamo Group Inc.
OPERATION
FRAME ASSEMBLY
Inspect condition of mounting frame weldment.
Inspect condition of King Post frame.
Ensure all bolts and screws are in position and
are properly torqued.
Ensure all pins are in place and fastened with
screws.
Ensure frame is properly mounted to tractor
and hardware is propely installed and
tightened. OPS-B- 0021_F
Relieve hydraulic pressure prior to doing any maintenance or repair work on the Implement.
Place the Mower Head on the ground or securely supported on blocks or stands, disengage
the PTO, and turn off the engine. Push and pull the control Levers or Joystick several times
to relieve pressure prior to starting any maintenance or repair work.
(SBM-6)
Never Leave the mower unattended while the head is in the raised
position. The mower could fall causing serious injury to anyone who
might inadvertently be under the mower
(SBM-4)
BOOM ARM ASSEMBLY
Inspect condition of each arm section weldment
Ensure all pins are in place.
Ensure all bolts and screws are properly
installed.
Check condition of bushings at boom pivot
points.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022_H