Ariens 924121 - 1128 Snow Blower User Manual


 
GB - 13
Install Discharge Chute - Electric
Rotation (924505, 506)
1. Remove chute motor cover.
2. Remove the six (6) nuts from ring gear
(Figure 7).
3. Remove two (2) half rings.
4. Position Discharge Chute over threaded
studs with the chute opening facing the
electric motor.
5. Replace the half rings.
6. Replace the six (6) nuts and tighten to
120 lbf-in. (13.56 Nm) torque.
7. Replace chute motor cover.
Connect Battery (924332, 505, 506,
508)
1. Remove wing nuts from battery cover.
2. Install wire lead to battery terminal.
3. Install battery cover and tighten wing
nuts.
Deector Remote (924121, 122, 332,
505, 506, 508)
1. Slide cable end through hole on bracket
on left side of chute (Figure 8).
2. Attach cable eye to stud on deector.
Hold in place with at washer and e-ring.
3. Check deector travel. Adjust nut on
cable end under handlebar to obtain full
travel. (See
Deflector Remote
in
Service
and Adjustments
.)
1.Pinion Bracket
2.Gear Strap
3.Chute Bracket
4.Retainer Clip
5.Lower Ring
6.Chute Ring
7.Mounting Nut
8.Flat Gear
9.Pinion
10.Chute Strap
11.Universal Joint
12.Spring Clip
DS0112
1
2
3
4
5
6
7
8
9
10
11
12
Figure 6
Figure 7
1.Ring Gear Nuts
2.Half Rings
3.Discharge Chute
1
2
3
OS1930