Alamo 4211 MSL Compact Loader User Manual


 
OPERATION
4211-4211SS MSL 01/11 Operation Section 4-26
© 2011 Alamo Group Inc.
OPERATION
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE: Do not be concerned if the bucket is not
completely filled during each pass. Maximum productivity is determined by the amount of material loaded in a
given period of time. Time is lost if two or more attempts are made to fill the bucket on each pass.
LIFTING THE LOAD
When lifting the load, keep the bucket positioned to
avoid spillage. Loader has mechanical self leveling
of attachment in both raise and lower cycle.
Attachment can be adjusted by using bucket
cylinders.