7
FIGURE 16
FIGURE 14
FIGURE 17
Attach the dump tube to the upper hopper frame 26.
using a U-clamp (34), 1/4" x 1-1/2" hex bolt (16) and
a 1/4" nylock nut (24).
Snap the dump handle clip onto the pivot rod. See 27.
gure16.
24
27
16
34
Slide the handle grip (29) onto the end of the handle 24.
tube(9)asshowningure15.
Assemble the handle tube (9) to the dump tube (5) 25.
and secure in place with a 1/4" x 1" curved head bolt
(26) and 1/4" nylock nut (24).
FIGURE 15
29
9
5
26
24
Slide the dump handle clip (33) over end of dump 23.
tube(5)untilitisinthelocationshowningure14.
NOTE: Some adjustment to the dump handle clip position
may be needed in a later assembly step.
Slide the pivot rod into each of the pivot rod retainers 28.
ontheendsofthebagarmchannels.Seegure17.
33
33
5