Effective April, 1999
IL 33-DB6-1
Page 16
For DB-25 Non-Fused Breakers Only.
L. Using a .219" drill bit, drill one hole in Phase 1
and 2, or Phase 2 and 3 Breaker Stabs, as
shown.
NOTE: For DB-25 Breakers equipped with
Secondary Contacts, an angle drilled can be
used so the contacts do not have to be
removed.
M. Cut the HV Wires to the appropriate length for
attachment to the Phase 1 and 2, or Phase 2
and 3 Top Breaker Stabs. Strip an appropriate
length of insulation from each HV Wire and
attach a .190" ring terminal. Connect the HV
Wires to the Breaker Stabs using the (2)
.190-32 x 1.00" screws, (4) flat washers, (2)
lock washers, and (2) nuts supplied.
For DBL-25 Fused Breakers Only.
L. Remove one (1) set of hardware securing
the fuses from the Phase 1 and 2, or Phase 2
and 3 Breaker Stabs.
M. Cut the HV Wires to the appropriate length for
attachment to the Phase 1 and 2, or Phase 2
and 3 Top Breaker Stabs. Strip an appropriate
length of insulation from each HV Wire and
attach a .375" ring terminal. Connect the HV
Wires to the Breaker Stabs using the hardware
removed in the previous step.