53
SERVICE JOURNAL
Action
20. Inform the customer about:
The need and advantages of following the service schedule.
The need and advantages of leaving the machine
for service every 300 hours.
The effects of service and maintaining a service journal on
the machine’s resale value.
Application areas for Mulch kit.
21. Fill in the sales papers, etc.
Date, mtr reading, stamp, sign
Delivery service has been carried
out.
No remaining notes.
Certified:
After the First 50 Hours
1. Change engine oil and filter.
Daily
Date, mtr reading, stamp, sign
Action
1. Check hydraulic oil level.
.
2. Check engine oil level.
3. Check coolant level in the overflow reservoir.
4. Check air cleaner dust load indicator.
5. Check/clean radiator debris guard.