Toro 3.80E+13 Snow Blower User Manual


 
5
1531
1
2
SQUEEZE
Figure 2
1. Upper tubing 2. Lower tubing
3. Carefully insert the left side of the upper tubing into
the end of the lower left side tubing (Fig. 2).
4. Squeeze the upper tubes together, and wiggle the upper
tubes down until the mounting holes in the upper and
lower tubing line up (Fig. 2).
5. Place the mounting plate over the tubes (Fig. 3). Align
the mounting plate holes with the upper and lower
tubing holes.
1532
2
3
1
4
Figure 3
1. Mounting plate
2. Shroud
3. Chute crank
4. Gear
6. Insert the end of the chute crank through the hole in
the shroud. Turn the chute crank rod lightly until the
flattened end drops into the slot in the gear. Firmly
push the chute crank into the gear until it snaps into
place (Figs. 3 and 4).
1533
1
2
Figure 4
1. Chute crank 2. Chute crank gear
7. Secure the upper and lower tubing and the mounting
plate together with 2 machine screws and locknuts.
Note: Position the screw heads on the outside of the
mounting plate. Be careful not to damage the internal
electrical wiring when you insert the screws. If the
wiring blocks the hole, use a blunt 1/8-in. punch to
carefully route the electrical wiring away from the aligned
holes.
Installing the Discharge Chute
1. Position the chute deflector onto the discharge chute
and align the mounting holes (Fig. 5).
1534
4
3
1
5
6
2
Figure 5
1. Chute deflector
2. Discharge chute
3. Rubber washer (2)
4. Carriage bolt (2)
5. Metal washer (2)
6. Locknut (2)
2. Insert 2 rubber washers between the chute deflector
and the discharge chute while maintaining the hole
alignment (Fig. 5).