1. The days prior to installation will not be shown in the Week 1
schedule. The controller shows what days have irrigated or it
anticipates what days will irrigate if the weather remains as it is
today. If the controller is installed on a Friday, there will be no
irrigation days shown prior to Friday, which may result in no
irrigation days at all for Week 1.
2. Turn the Lower Line knob to see irrigation day schedules for
Week 2 – 8. The irrigation days will display a pattern as you step
through the subsequent displays.
The REVIEW display indicates 99+ minutes.
1. Since the displayed cycle time is limited to two digits, 99+
is shown when the total programmed cycle time is greater
than 99 minutes. This display does not indicate a controller
malfunction.
Week 1 of the watering day schedule appears incomplete.
67