Normal Removal &
Installation
10
A. Channel Assembly K. Lower Chute Rod
B. Cover L. Lower Chute
C. Pin M. Pin
D. Hitch N. Strap, Middle
E. Bag O. Upper Tube
F. White Bar P. Ridge
G. Nut & Capscrew Q. Ridge Cutout
H. Deflector R. Tubes, Bag Support
I. Strap, Boot S. Middle Tube
J. Mounting plate
E
P
D
B
Normal Removal & Installation
Collector Installation
Note: See previous pages for more detailed installation
and operation instructions if necessary.
1. Mount the the channel assembly (A, Figure 17) into
hitch (D). Secure with by inserting pin (C) into the
right side of hitch (D) and turning pin (C) counter-
clockwise to lock in place.
2. Pivot cover (B) up. Install bags (E) with white bar (F)
towards the rear.
3. Lift discharge deflector (H) up. Insert lower chute rod
(K) into mounting plate (J). Pull strap (I) and secure
Figure 17. Normal Installation & Removal
C
O
S
N
I
L
M
K
J
H
Q
A
G
R
by placing hole closest to knob in strap completely
over locknut and capscrew (G).
4. Slide the upper tube (O) into cover (B) aligning ridge
(P) with cutout (Q) as shown.
5. Slide middle tube (S) into upper tube (O). Slide mid-
dle tube (S) over lower chute (L). Pull strap (N) and
place hole completely over pin (M).
F