Servis-Rhino 2412 Compact Loader User Manual


 
OPERATION
2412 01/11 Operation Section 4-14
© 2011 Alamo Group Inc.
OPERATION
LOADER BOOM ASSEMBLY
Inspect condition of each arm section weldment
Ensure all pins are in place.
Ensure all bolts and screws are properly
installed.
Check condition of bushings at boom pivot
points.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-L-0005_B
HYDRAULIC LINE INSPECTION
Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
Inspect the condition of the valve weldment.
Ensure fitting is properly connected
Inspect condition of bushings. OPS-L-0018_B
Hydraulic Hoses
BUCKET INSPECTION
Ensure all pins are in place.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
Inspect the condition of the bucket lug
weldments.
Inspect condition of bushings.
OPS-L-0007_B
Bucket Pins