Sears 831.105021 Hot Tub User Manual


 
8
SET-UP AND ASSEMBLY
Before beginning assembly, carefully read the
following information and instructions:
Place all parts in a cleared area and remove the
packing materials from the spa shell; do not dis-
pose of the packing materials until assembly is
completed and the spa is in operation.
Assembly requires two people.
Note: Some small parts may have been pre-
attached for shipping. If a part is not in the parts
bag, check to see if it has been pre-attached.
During assembly, make sure that all parts are ori-
ented as shown in the drawings.
Read each assembly step before you begin.
Tighten all parts as you assemble them, unless
instructed to do otherwise.
ASSEMBLY REQUIRES THE FOLLOWING
TOOLS (not included):
• One (1) phillips screwdriver
1. Before beginning assembly, make sure that you
have read and understand the information on
the previous two pages.
Remove the four screws from the access cover on
the console side of the spa. Remove the access
cover by sliding it down and then pulling the bottom
of it away from the spa. Be careful not to damage
the spa shell.
Remove the Power Cord with the GFCI from inside
the spa.
2. Locate and check the positions of the two cut-off
valves. The cut-off valves may have been closed at
the factory during manufacturing. However, the cut-
off valves must be open for spa operation. To open
the valves, hold the handles and turn them until you
can pull them out to the open position. IMPORTANT:
THE MOTOR WILL BE DAMAGED IF IT IS OPER-
ATED WITH THE CUT-OFF VALVES CLOSED.
Close the valve knob on the drain hose. Thread the
cap onto the drain hose. Thread the drain plug into
the Pump Motor (13). Tighten the two pump fittings.
2
Cut-off
Valve
Pump
Fittings
Cut-off
Valve
Drain
Plug
Drain Hose
Valve
Knob
Cap
13
Screws
Power Cord
Access
Cover
1