6
ASSEMBLY / PRE-OPERATION
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.
• Reduce tire pressure to 14-17 PSI.
CONTROL LEVER
KNOB
6. Install all control lever knobs by pressing them down
onto the control levers.
FIG. 6
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 4)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Position chute rotater head over chute bracket. If nec es-
sary, rotate chute assembly to align square and pin on un-
der side of chute rotater head with holes in chute brack et.
3. With chute rotater head and chute bracket aligned,
po si tion chute rotater head on pin and threaded stud
of mounting bracket.
4. Install locknut and cable guide on threaded stud and
tighten securely.
FIG. 4
CHUTE
ROTATER
HEAD
CABLE GUIDE
LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD
MOUNT ING
BRACKET
CHUTE
BRACKET
ALIGN BEFORE
TIGHTENING LOCKNUT
FIG. 5
CABLE GUIDE
ROTATOR
CABLES
ROTATOR
CABLES
DOUBLE
CLIP
5. Place rotator cables through cable guide and secure
cables to the lower handle using the double clip.