ASSEMBLY
• Sit on seat in operating position, depress clutch/brake
pedal and set the parking brake,
• Place motion control lever in neutral (N) position,
• Press lift lever plunger and raise attachment lift lever
to its highest position,
• Remove key from bag and start the engine (see "TO
START ENGINE" in the Operation section of this man-
ual), After engine has started, move throttle control to
idle (slow) position.
• Release parking brake.
• Slowly move the motion control lever forward and slowly
drive tractor off skid,
• Apply brake to stop tractor, set parking brake and place
motion control lever in neutral position,
• Turn ignition key to "STOP" position,
Continue with the instructions that follow,
TO INSTALL BAGGER COMPONENTS TO
TRACTOR (See Figs. 4A-4D)
• Remove discharge chute from rear of tractor, Unhook
the two (2) straps and pull chute out and away from
tractor.
• Remove the two (2) 3/8 nuts and flat washers from the
bolts at the tractor back plate.
Replace discharge chute into rear opening of tractor,
Secure the chute with the two hook straps.
CLEVIS PIN 10 X 17MM
3J8,ocKNUT
FLATWASHER
3/8 X 63,5MM HEX BOLT /
/
RETAINER SPRING
FIG. 4C
NOTE:The strap hook must gothrough the discharge chute
only. Do not allow the hook to enter the slot in the tractor
back plate,This will allow the discharge chute to float with the
mower deck when moving on uneven terrain,
CHUTE
FIG. 4D
BACKPLATE
SLOT
FIG. 4A
Using the nuts and flat washers removed from tractor
back plate, install the bagger support tube to the back
plate as shown. Tighten securely.
SUPPORT
TUBE
FLAT
WASHER
• 8 NUT
BOLT
FIG. 4B
Install the two upper support brackets through the back
plate and to the chassis, install the clevis pin 10x17mm
and secure with retainer spring.
Assemble both support brackets to the outside of the
bagger support tube using two each 3/8 x 63,5mm hex
bolts 13/32" I.D,flat washe rsand 3/8 Iocknuts from parts
bag. Tighten securely.
TO ASSEMBLE BAGGER (See Figs. 5A-50)
• Unfold bag by pivoting front bagger tube all the way
forward and pressing the bottom vinyl binding onto the
tube.
• Inside the bag,install spreader bars and retainer springs
onto pins on both sides of bag as shown,
• Press the vinyl bindings onto the sides of front bagger
tube.
• Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin 10 x 44ram and secure
with retainer spring,
FRONT BAGGER TUBE
VINYL BINDING
FIG. 5A
8