Page 14
J-400
Figure D
L2
L1
L1
L2
1. Main Terminal Block
2. Heater Terminal Block
3. Bonding Lug/Grounding Terminal
4. Power wires Entrance (Electrical tting and conduit must be
installed)
Figure E
Terminal Connection
(Export 230 VAC 50 Hz Connection Shown)
** May only require one green
grounding wire. Check your local
country codes.
*Electrical tting and conduit must be installed
L2
L1
L1
L2
Main
Terminal
Block
Use screwdriver
to pry open
the connector
Insert power
wires and
secure
connection
Power In*
L2
L1
Heater
Terminal
Block
Use screwdriver
to pry open
the connector
Insert power
wires and
secure connection
L1
L2
Power In
*
Green**
BRW
BRW
BLU
BLU
Power In
*
Main
Terminal
Block
Grounding
Lug
L2L1
L1L2
Heater
Terminal
Block
BLU
BRW
BLU
BRW
Green**
3
1
4
2