Jacuzzi J-220 Hot Tub User Manual


 
page 12
Figure-B - Control Box
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
TB1
3
2
1
7
8
3 6
2 2
Figure-A
Equipment Area
1. Control Box
2. Power Supply Inlet(s)
3. 2-Speed Pump #1
4. Heater
5. Pump Drain Plug
6. 1-Speed Pump #2
7. Optional CD Ozonator (Purchased Separately)
8. Ozone Injector
Flow
Note: Pump Locations Vary by Model
5 5
1
4
BLUE
BLUE
BROWN
BROWN
1
2
US/Canada J-230 Models:
240 VAC, 3-Wire Connection (60Hz)
Figure-F
TB1
All Export J-210 / J-220 / J-230 Models:
230 VAC, 3-Wire (50Hz)
to Circuit
Board
BLK
RED
Power In
RED
RED
BLK
BLK
1
2
Figure-E
TB1
to Circuit
Board
Power In
Green
TB3
Green
TB3
GRN
WHT
WHT
BLK
BLK
BLK
RED
1
2
3
Figure-C
TB1
to Circuit
Board
Power In
GRN
WHT WHT
BLK
BLK
BLK
RED
RED
1
2
3
All US/Canada J-210 / J-220 Convertible
Models: 120/240 VAC, 4-Wire Connection (60Hz)
Figure-D
TB1
to Circuit
Board
Power In
All US/Canada J-210 /
J-
220 Convertible
Models: 120 VAC, 3-Wire Connection (60Hz)