Jacuzzi J-220 Hot Tub User Manual


 
page 9
6.0 Power Requirements
Jacuzzi
®
spas are designed to provide optimum performance and flex-
ibility of use when connected to the maximum electrical service listed in
the tables below. If you prefer, your dealer can perform a minor circuit
board modification to allow your spa to accept an electrical service other
than the factory setting.
US / Canada J-230 2-Pump Model (60Hz)
240V/40A* 240V/50A** 240V/60A***
Voltage: 240 VAC 240 VAC 240 VAC
# of Wires: 3 3 3
Frequency: 60Hz 60Hz 60Hz
Current Draw: 26A 36A 45A
Circuit Breaker: 40A, 2-Pole 50A, 2-Pole 60A, 2-Pole
* In 40A configuration, the heater will not operate while either jets
pump is running in high speed. Note: pump 2 runs only in high speed.
**
In 50A configuration, the heater will not operate while both jet pumps
are running in high speed. Note: pump 2 runs only in high speed.
This is the factory setting.
*** In 60A configuration, the heater will operate while both jet pumps are
running in high speed.
Note: pump 2 runs only in high speed.
US/Canada J-210/J-220 1-Pump Convertible Model (60Hz)
120V/15A* 240V/30A* 240V/40A**
Voltage: 120 VAC 240 VAC 240 VAC
# of Wires: 3 (15A GFCI Cord 4 4
US only*)
Frequency: 60Hz 60Hz 60Hz
Current Draw: 12A 21A 30A
Circuit Breaker: 15A, 1-Pole 30A, 2-Pole 40A, 2-Pole
For 240 VAC Heater Operation: Move the red wire on the main terminal
strip (TB1) from position #1 to position #3. Make certain wires are con-
nected exactly as shown in Figure-D (page 12) before applying power.
Failure to do so will result in damage to the circuit board and/or related
components and void the manufacturer’s warranty.
*All Canadian spas must be hard wired (120 VAC or 240 VAC) per
CSA Canadian standards. (page 4).
*
In 15A/30A configuration, the heater will not operate at the same
time as the high-speed jets pump. The factory setting is 120V/15A.
**
In 40A configuration, remove the jumper JP1 #1-2 on the circuit
board to allow the heater to operate at the same time as the
high-speed jets pump (page 32).