Generac RG03624ANSX Portable Generator User Manual


 
Activation and Startup
Owner’s Manual for Stationary Emergency Generators 17
1. Verify that the generator is OFF. A red LED on the control panel illuminates to confirm that the system is in the
OFF mode.
2. Install front cover of the transfer switch.
3. Turn ON the utility power supply to the transfer switch, using the means provided (such as a utility main line cir-
cuit breaker).
NOTE: Transfer Switch will transfer back to utility position.
4. Move the Main Circuit Breaker switch on the generator control panel up to the ON (or closed) position.
5. Press AUTO on the control panel. The system is now ready for automatic operation.
6. Turn OFF the utility power supply to the transfer switch.
With the generator ready for automatic operation, the engine will crank and start when the utility source power is turned
OFF after a 10 second delay (factory default setting). After starting, the transfer switch connects load circuits to the
standby side. Let the system operate through its entire automatic sequence of operation.
With the generator running and loads powered by generator AC output, turn ON the utility power supply to the transfer
switch. The system transfers back to the utility position and then runs through the cool down cycle and shuts down.
3.8 — Final Instructions
1. Use key to install left and right side access panels.
2. Close viewing window.
NOTE: Obtain viewing window hasp, if not installed. See
Figure 3-6. With the retaining tab at the bottom, insert
square end of hasp into slot below viewing window.
Push on hasp until it snaps in place. Gently pull on hasp
to verify that it will not come free.
3. Install customer supplied padlock into hasp.
Figure 3-6. Install Viewing Window Hasp