To place the new belt begin by routing the belt around the 5.
two outer spindle pulleys, then around the front spindle
pulley as shown in Fig. 7-9.
Route the belt around the two deck idler pulleys as shown 6.
in Fig. 7-9.
Reinstall the belt keeper rod loosened earlier.7.
CAUTION: Failure to reinstall the belt keeper rod
system.Remount the belt guards removed earlier.
Re-install the deck making sure the belt remains routed 8.
around the pulleys as instructed.
9.
While holding the belt and pulley together, rotate the
rotating the pulley and belt until the belt is fully rolled into
28 se c t i O n 7— se r v i c e