DEALER PREPARATION CHECK LIST
COMMERCIAL ZERO TURN RIDING MOWER
BEFORE DELIVERING MACHINE — The following check list should be completed.
Use the Operator’s Manual as a guide.
❒
1. Engine has been serviced.
❒ 2. Battery fluid level is checked.
❒
3. Low oil pressure warning buzzer checked for operation.
❒ 4. Operator interlock switches checked for operation.
❒
5. Assembly completed.
❒ 6. All fittings lubricated.
❒
7. Hydraulic Reservoir filled with oil.
❒
8. All shields in place and in good condition.
❒
9. Roll-over Protective Structure is installed and retractable seat belt functions properly.
❒
10. All fasteners torqued to specifications given in Torque Chart.
❒
11. All decals in place and readable. (See decal page.)
❒
12. Overall condition good (i.e. paint, welds)
❒
13. Parking brake checked and adjusted, if necessary.
❒
14. Steering checked and adjusted, if necessary.
❒
15. Check tire pressure.
❒ 16. Operators manual has been delivered to owner and he has been instructed
on the safe and proper use of the cutter.
Dealer’s Signature
Purchaser’s Signature
THIS CHECKLIST T
O REMAIN IN OWNER’S MANUAL
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
WARRANTY REGISTRATION AND DELIVERY REPORT
It is the responsibility of the Dealer to do the following:
•
Complete the Warranty Registration and Delivery Report
•
Return the pre-addressed card copy to Bush Hog, L.L.C.
•
Retain pink copy for dealership records
3