![](http://pdfasset.owneriq.net/4/5f/45f12a5e-4dd6-47c7-969e-52fc358a5f8c/45f12a5e-4dd6-47c7-969e-52fc358a5f8c-bg4c.png)
OPERATION
2545 01/11 Operation Section 4-32
© 2011 Alamo Group Inc.
OPERATION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make
it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.