![](http://pdfasset.owneriq.net/4/5f/45f12a5e-4dd6-47c7-969e-52fc358a5f8c/45f12a5e-4dd6-47c7-969e-52fc358a5f8c-bg49.png)
OPERATION
2545 01/11 Operation Section 4-29
© 2011 Alamo Group Inc.
OPERATION
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Another method for large dirt piles is to build a ramp
approach to the pile.