10
30SB, 36SB, 45SB
Snow BEAST
Snow BEAST Snow Blower
V8.10.25.12
1. Locate the connection: The chute rotation cable connection is located at
the base of the discharge chute between the engine and the discharge chute.
2. Slide the threaded end of the connector down the
cable in order to easily see the end of the cable con-
nection. The center section should be about 3/4” to
1” beyond the end of the cable.
NOTE: There is nothing wrong if the end of the cen-
ter section of the cable protrudes more than about
3/4” to 1” beyond the end of the cable.
The center section can be easily pushed back into
the cable.
3. Align the center section with the cable chute rotator. The end
of the center section is square and requires proper alignment in
order to correctly connect to the machine.
4. Press the cable toward the chute rotator screw. The end of the
cable should touch the end of the chute rotator.
If the surfaces do not contact, continue to apply pressure and
slowly rotate the discharge chute direction handle on the control
panel so the center of the cable aligns itself on both ends.
5. Slide the threaded end from Step 2 toward the chute rotator,
and thread the end onto the chute rotator.
IMPORTANT: Finger tighten firmly. Inspect before each use to make cer-
tain the connection doesn’t loosen during operation of the machine.
Step 3: Chute Rotation Cable Connection (continued)
Assembly Instructions
Need Help With Assembly?
(919)-550-3221