Smart-UPS 750/1000/1500/2200/3000 VA 120/230 Vac Tower 4
Operation
Connect Equipment to the UPS
Note: The UPS will charge to 90% capacity in the first three hours of normal operation. Do
not expect full battery run capability during this initial charge period.
1. Connect equipment to the outlets on the rear panel of the UPS. Do not use extension cords, plug
equipment directly into the UPS.
2. Connect the UPS to the building utility power. Connect the UPS to a two-pole, three-wire,
grounded receptacle only.
3. Press the
ON/OFF button on the front panel of the UPS to apply power to the unit and all connected
equipment.
4. To use the UPS as a master on/off switch, turn on all the equipment that is connected to the UPS.
See “UPS Settings” on page 7 for information on how to configure the outlet groups.
Rear Panel Features
Serial port: Connect to a computer to use power management software.
USB port: Connect to a computer to use power management software.
Ground Screw: Connect the ground leads on transient voltage devices to the
chassis ground screw(s), located on the rear panel of the UPS.
su0441a