Alamo 95C Compact Excavator User Manual


 
OPERATION
F-4145 01/11 Operation Section 4-7
© 2011 Alamo Group Inc.
OPERATION
To finish the rear wall, lift up and crowd in. Keep the edges
of the bucket horizontal.
BACKFILLING
Backfill by lifting the bucket over the spoil pile and then
crowding in. Pull both the crowd and lift levers for smooth,
even backfilling.
IMPORTANT: Do not backfill by using the swing circuit and
dragging the bucket sideways. Doing so can cause
damage to the dipstick, boom, swing cylinders, or
mainframe.
SEAT ADJUSTMENT
To adjust seat up or down, remove clevis pin (1) and hair
pin (2) which secures seat bracket (3) to seat post (4) and
raise or lower the seat. Adjust seat forward or rearward by
repositioning seat on mounting plate (5).
MOUNTING AND DISMOUNTING BUCKETS
Mount buckets using 1 x 6-5/8 antirotation pins (1), 3/8 x 1-
1/8 cap screws (2) and lock nuts (3).