Alamo 1595 Compact Loader User Manual


 
ASSEMBLY
1595 01/11 Assembly Section 3-11
© 2011 Alamo Group Inc.
ASSEMBLY
Plumbing Loader to Control Valve
1. Install Hoses onto boom oil tubes. Install and
tighten one at a time from the bottom up. Loosening
the closest oil line clamp will ease installation.
2. Install large identification dust plugs onto free ends
of hoses. Slide hose sleeve over hoses. Install
female quick couplers onto free ends of hoses.
Hose Color identification
Yellow - Lift Cylinder Rod
Green - Lift Cylinder Base End
Red - Bucket Cylinder Rod
Blue - Bucket Cylinder Base Rod
3. Connect hoses from upper two boom oil lines to
right male couplers on valve. Connect lower two
boom oil lines to left male quick couplers on valve.
4. Attach free end of rubber strap to loader right side
frame.
5. After all plumbing has been completed, slowly cycle
lift and bucket cylinders several times to purge air
from hydraulic system. Retract cylinders and shut
off tractor engine, engage parking brake, and
remove key. Replenish tractor hydraulic system with
recommended hydraulic fluid. (Figure AsmP-L-
0003)
Escaping hydraulic fluid under pressure can have sufficient force to penetrate skin causing
serious personal injury. If injured by escaping hydraulic fluid, obtain medical treatment
immediately.