Alamo 1595 Compact Loader User Manual


 
ASSEMBLY
1595 01/11 Assembly Section 3-9
© 2011 Alamo Group Inc.
ASSEMBLY
5. On level ground, tilt the attachment down 90 degrees
and lower it to the ground. Lower the loader further to
slightly raise the front of the tractor of the tractor off
the ground. Drive the tractor in reverse while the
attachment is on the ground for 20-30 feet to insure
the attachment does not disconnect. If the attach-
ment disconnects during this process, discontinue
the use of attachment and contact your dealer.
Do not use an attachment that is not securely attachment that is not
securely attached to the quick hitch. The attachment could fall resulting in
severe crushing injuries or death to the operator or bystanders.
Plumbing Hydraulic Valve
1. Install O-Ring 90º elbow fittings in port on each
side of valve pointing away from handle. Install
O-Ring 90º elbow fitting in front tank port point-
ing away from handle. Tighten jam nuts.
2. Install straight O-Ring to pipe adapters on front
ports of valve. Install male quick couplers on
male adapters on valve. Attach color coded
identification dust covers on quick couplers.
Boom lift is on right and bucket functions are on
left. Figure AsmP-L-0001