A SERVICE OF

logo

ASSEMBLY
OM 0182SB-A 16
Figure15
Electrical Diagram
Installation of Electric Deflector Kit 9370 (Option)
(Figure 15 and Electrical Diagram)
1. Remove manual adjustment knob and bolts
from sides of deflector and replace them
with two 5/16” x 3/4” carriage bolts. Secure
with the original nylon flat washers and
supplied nylon nuts. Leave approximately
1/16" (1.6 mm) play.
2. Drill two 9/32" (7mm) dia. holes in chute as
shown in figure 15.
3. Attach (item 1) the actuator to the chute with
two 1/4" x 1 1/2" (10-24 NC) shoulder
screws (item 3), two spacers (item 2), two
flat washers (item 4) on the outside and 10-
24 NC nylon hex. nut (item 5). Place screws
in the actuator and thread the spacers on
the screws so that the screws do not
protrude the nuts once threaded.
NOTE: Refer to Electrical diagram.
4. Solder one 18” (457 mm) wire to fuse holder
side terminal and the other 18” (457 mm)
wire with eyelet to the bottom terminal.
5. Install control switch and fuse holder.
Thread rubber protector over switch.
6. Connect eyelet of 18” (457 mm) wire to "b"
terminal of control switch.
7. Connect one end of the 17” (432 mm) wire
to "e" terminal on control switch and other
end to a suitable ground on tractor frame.
8. Connect one end of the 5” (127 mm) wire to
a terminal and other end to "d" terminal on
control switch.
9. Connect one end of other 5” (127 mm) wire
to "c" terminal and other end to "f" terminal
on control switch.
10. Attach eyelet end of the 102” (2.59 m)
double wire to "a" and "f" terminals on
control switch.
11. Connect fused wire to wire from tractor
ignition switch "AC" terminal using
connector tap.
12. Connect free end of the double wire to the
electric motor. Cut this wire at a convenient
location for blower removal. Install the wire
connectors with one male and one female
connector to the motor half of the wire.
13. Secure wires away from moving parts using
the provided tie wraps and adhesive clips.