A SERVICE OF

logo

Chapter 2 Installing ReadySystem 1U Options
14 Users Guide ReadySystem 1U
7. Position the ReadyBoard near the eight standoffs on the enclosure base at about a 10° angle to the
mounting surface. See Figures 2-7 and 2-8.
8. Insert the ReadyBoard and its LAN connectors just under the lip of the LAN port on the
enclosure wall, behind the I/O panel. See Figure 2-7.
9. Slowly work the ReadyBoard into place, inserting the I/O connectors and LEDs into the
respective openings on the I/O Panel.
When you have the ReadyBoard in position you should clearly see the mounting holes for the
eight standoffs under the board mounting holes, and the LEDs should fit into the openings
provided on the I/O Panel.
RdySy1U_11a
LAN Port
Lip
I/O Panel
R
e
a
d
y
B
o
a
r
d
1
0
A
n
g
l
e
°
ReadyBox 1U
Left Side View
L
A
N
1
I/O Panel
Insert ReadyBoard
into enclosure just
above standoffs
ReadyBox 1U
Right Side View
Figure 2-7. ReadyBoard Positioned Under LAN Ports
RdySy1U_12bb
M3x0.5 Screws (8)
6 mm Thread Length
with washers and
lock washers
ReadyBoard
Note:
A
ll standoffs have a
thread size of M3x0.5
and accept M3x0.5 screws.
Figure 2-8. Installing ReadyBoard into Enclosure