Troy-Bilt 1400 Snow Blower User Manual


 
8 Section 2— ASSembly & Set-Up
2. Attach the upper handle to the mid handle using one
carriage screw and handle knob on each side. See Figure
3-3.
NOTE: Make sure the cord is routed behind the handle
assembly.
Carriage Bolt
Carriage Bolt
Handle Knobs
Figure 3-3
3. Ensure that the cord retainer is on the mid handle’s
crossbar. Refer to Figure 3-2. Place the mid and upper
handles onto the lower handle. See Figure 3-4.
Carriage Bolt
Carriage Bolt
Handle Knobs
Figure 3-4
4. Insert wing knobs and carriage bolt and tighten to secure
upper handle and mid handle to the lower handle. See
Figure 3-4.
5. Secure motor cord to cable guide. See Figure 3-5.
NOTE: The motor cord runs behind the upper handle.
Cable Guide
Motor Cord
Figure 3-5
Chute Assembly
1. Remove the four screws securing the front cover to the
auger housing. Remove the front cover and the chute. See
Figure 3-6.
Screw
Front Cover
Chute Assembly
Figure 3-6
2. Remove the wing knob, bell washer and bolt from the left
side of the chute. See Figure 3-7.
3. Pivot the upper chute upwards and over the lip and the top
of the lower chute.
4. Reinstall the wing knob, bell washer and bolt.