4
Assemble the AKZ 360 Rotating Base Hub
1. Separate the rotating hub from the AKZ main frame by pulling it out
from the frame (Fig.1).
2. Select area to set base and place in desired location.
3. Remove inverted base stem fr
om base shell using the steel wrench.
Turn the steel wrench in counter-clockwise motion (Fig.2).
4. Remove base shell (Fig.3).
5. Return inverted base stem into base shell (Fig.4).
Please note: This step is necessary to prevent sand from entering
base stem channel. If sand does enter base stem channel, remove
immediately as it will impede further installation.
6. Fill the base with dry playground sand (Fig.5).
The AKZ Base holds up to 250 lbs. of sand. When filling the base,
it is necessary to wet down the sand after partial installation. Fill the
base with remaining sand after wet down.
* Base weight will be 250 lbs. after sand and water is added.
7. Remove inverted base stem (repeat step 2) (Fig.6).
8. Place Base Lid back onto Base Shell and install the inverted base
stem (Fig.7). (Do not over tighten inverted base stem, or parts may be
damaged).
9. Insert the Rotating Hub into the inverted base stem, and tighten with
supplied nuts & bolts (Fig.8).
ASSEMBLY INSTRUCTIONS
11
FT. COMMERCIAL CANTILEVER UMBRELLA
(Fig.1)
(Fig.2)
(Fig.3)
(Fig.4)
(Fig.5)
(Fig.6) (Fig.7) (Fig.8)