22
Initial Assembly
Pull drawstring tight.
Lift discharge
chute and slide
bag over chute.
Make sure bag
noose fits over
top of discharge
chute and notch
in chute bottom.
Slide bag over dis-
charge chute.
Make sure bag
noose fits over top
of discharge chute
and notch in chute
bottom.
Pull drawstring tight.
Figure 22. Discharge Bag - North American Models Figure 23. Discharge Bag - CE Models
Install Discharge Bag
This product comes with a discharge bag for collection of
debris as it exits the discharge chute. Install the bag as
shown in Figure 22 or 23.
Add Engine Oil
Refer to “Engine Oil Type and Capacity” in the Regular
Maintenance section for oil type and fill procedures.
Add Fuel
Refer to “Adding Fuel” in the Operation section for fuel
specifications and filling procedures.