Quick Setup List -
520 Single Stage Snowthrower
5/2005
3
Page Setup Procedure Steps to Perform
4 Unbox & Assemble ❏ Remove Unit From Box.
❏ Install Discharge Chute
❏ Assemble Handle Bars
(Be careful not to pinch the auger cable)
❏ Mount Clean-Out Tool in storage position
on handle
5 Fill Gas Tank ❏ Fill Gas Tank
6 Lubricate Snowthrower ❏ Lubricate all grease & oil points
7 Test Run ❏ Check Primer
❏ Check Choke
❏ Check Recoil Starter
❏ Check Electric Starter (Where Applicable)
❏ Check Auger Control Cable
❏ Check Kill Switch
❏ Check Chute Rotator
❏ Check Deflector
Additional information concerning functional
tests, general adjustment procedures, and
the location of normal lubrication points are
included in these instructions.
Although all required lubrication and normal adjust-
ments on factory-assembled components are done at
the factory, this additional information is provided to
assist you in ensuring that each unit is delivered to the
customer in proper working order.