OPERATION
Pre-Operation Inspection and Service
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and
functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any
condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as
noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be
avoided. OPS-U-0029
OPERATION
Always disconnect the main PTO Driveline from the Tractor before performing service on
the Implement. Never work on the Implement with the tractor PTO driveline connected
and running. Rotating Parts, Blades or Drivelines could turn without warning and cause
immediate entanglement, injury or death. (S3PT-11)
Never work under the Implement, the framework, or any lifted
component unless the Implement is securely supported or blocked
up to prevent sudden or inadvertent falling which could cause
serious injury or even death. (SG-14)
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners,
worn or broken parts, and leaky or loose fittings. Make sure all
pins have cotter pins and washers. Serious injury may occur from
not maintaining this machine in good working order. (SG-21)
AGM 52-62-72-82 10/10
Operation Section 4-23
© 2010 Alamo Group Inc.