Servis-Rhino 00781400C Lawn Mower User Manual


 
OPERATION
172 02/11 Operation Section 4-15
© 2011 Alamo Group Inc.
OPERATION
Shorten the driveline profiles as follows:
Remove the driveline from the tractor.
Raise and lower the mower to find the position
with the shortest distance between the tractor
PTO shaft and cutter gearbox. Shut down the
tractor and securely block the mower in this
position.
Pull driveline apart and reattach yoke to PTO
shaft.
Hold driveline sections parallel to one another
and measure back 1” from yoke of each shaft
and place mark on opposite section. Cut this
length off with a saw.
Round off all sharp edges and debur.
Thoroughly grease then reinstall the driveline.
Recheck for proper operation.
Engagement Check Procedure
With the driveline attached, raise and lower the mower within its operating range. Position the mower to
the point where the telescoping driveline is at its maximum extension. Completely shut down the tractor
and secure in position.
Mark the inner driveline shield 1/8” from the end of the outer shield.
Disconnect the driveline from the tractor and separate the two driveline halves.
Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.
If the engaged length is less than 9”, the shaft is considered too short and should be replaced with a longer
shaft. Consult an authorized dealer to purchase the required driveline length.
NOTE: When raising the mower, at least 1” clearance must be maintained between the driveline and the
mower deck. If necessary, place an upper lift stop on the 3-point hitch control lever to limit the height the
mower can be raised. OPS-R-0005_E
8. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided. OPS-U-0029
Always disconnect the main PTO Driveline from the Tractor before performing service on
the Implement. Never work on the Implement with the tractor PTO driveline connected and
running. Rotating Parts, Blades or Drivelines could turn without warning and cause
immediate entanglement, injury or death.
(S3PT-11)