Scag Power Equipment GC-STT-V Blower User Manual


 
3
DISCHARGE CHUTE OPENING
FRONT OF
CUTTER DECK
REAR OF
CUTTER DECK
VIEW FROM RIGHT SIDE
OF CUTTER DECK
Figure 2-52"GC-STT install art
CUTTER DECK
BELL CRANK
LIFT LINK
SPACER
SPACER
NUT
NUT
WASHER
BOLT, 3/8-16
x 1-1/2"
BOLT, 3/8-16
x 1-1/4"
52" Cutter Deck
FIGURE 3-3
8. Install the blower assembly to the mounting
bracket and secure with the mounting pin and
hair pin. See Figure 3-5, Page 4.
9. Align the blower assembly with the discharge
opening of the cutter deck. Tighten the
hardware for the mounting bracket. Install the
quick pin through the rear hole in the discharge
chute mounting bracket. See Figure
3-5, Page 4.
10. Install the new belt cover from the cutter deck to
the blower mounting bracket and secure with the
original belt cover plastic wing nuts.
11. Install the belt to the spindle pulley. When
replacing the belt, see figure below.
FRONT SIDE
IDLER PULLEY
BACK SIDE
IDLER PULLEY
BLOWER
PULLEY
SPINDLE
PULLEY
12. Install the plastic belt cover and secure with the
plastic wing nuts. See Page 12 of the Illustrated
Parts List for proper installation.