North Star 27500 Portable Generator User Manual


 
7
Dev ice Running Watts
Air Conditioner (12,000 Btu) 1700 (a)
Battery Charger (20 Amp) 500
Belt Sander (3”) 1000
Chain Saw 1200
Circular Saw (6-1/2”) 900
Coffee Maker 1000
Compressor (1 HP) 2000 (a)
Compressor (3/4 HP) 1800 (a)
Compressor (1/2 HP) 1400 (a)
Curling Iron 700
Dishwasher 1200
Edge Trimmer 500
Electric Nail Gun 1200
Electric Range (one element) 1500
Electric Skillet 1250
Freezer 800 (b)
Furnace Fan (1/3 HP) 1200 (a)
Hair Dryer 1200
Hand Drill (1”) 1100
Hand Drill (1/2”) 875
Hand Drill (3/8”) 500
Hand Drill (1/4”) 250
Hedge Trimmer 450
Home Computer 150
Impact Wrench 500
Jet Pump 800 (a)
Lawn Mower 1200
Light Bulb 100
Microwave Oven 700
Milk Cooler 1100 (a)
Oil Burner on Furnace 300
Oil Fired Space Htr (140,000 Btu) 400
Oil Fired Space Htr (85,000 Btu) 225
Oil Fired Space Htr (30,000 Btu) 150
Oven 4500
Paint Sprayer, Airless (1/3 HP) 600 (a)
Paint Sprayer, Airless (handheld) 150
Radio 200
Refrigerator 600 (b)
Slow Cooker 200
Submersi ble Pump (1-1/2 HP) 2800 (a)
Submersible Pump (1 HP) 2000 (a)
Submersi ble Pump (1/2 HP) 1500 (a)
Sump Pump 600 (a)
Table Saw (10”) 2000 (a)
Television 500
Toaster 1000
Vacuum cleaner 250
VCR 70
Water Heater 3000
Weed Trimmer 500
(a) Hard-starting motors require 3 to 5 times the
rated running watts.
(b) These loads may require up to 15 minutes to
restart due to its normal build up of compressor head
pressure.
NOTE: For extremely hard to start loads such as
air conditioners and air compressors, consult the
equipment dealer to determine the maximum wattage.
PRE-START UP PREPARATIONS
Your generator has been thoroughly tested prior to
shipment from the factory. However, damage can
occur during shipping, so be sure to check for
damaged parts, loose or missing nuts and bolts. If the
these problems occur, call Customer Service at 1-800-
270-0810.
GROUNDING - All units must be grounded. Drive
a 3/4” or 1” copper pipe or rod into the ground close to
the generator. The pipe/rod must penetrate moist
earth. Connect an approved ground clamp to the pipe.
Run a 8 gauge wire from the clamp to the generator
ground screw. Do not connect to a water pipe or a
ground used by a radio system.
OPERATING SPEED
The generator must be run at the correct speed in
order to produce the proper electrical voltage and
frequency.
The output voltage should be checked to ensure
the generator is working properly subsequent to
connecting a load to the generator. Fail ure to do so
could result in damage to equipment plugged into the
unit and possible injury to the indi vidual.
All engines have a tendency to slow down when a
load is applied. When the electrical load is connected
to the generator, the engine is more heavily loaded,
and as a result the speed drops slightly. This slight
decrease in speed, together with the voltage drop
within the generator itself, results in a slightly lower
voltage when the generator is loaded to its full capacity
than when it is running with no load. The slight
variation has no appreciable effect in the operation of
motors, lights and most appliances. Electronic
equipment and clocks will be effected if correct RPM is
not maintained. See Load vs. Output chart
Load Output
Percent of
Generator
Output
Speed
(RPM)
Frequency
(Hz)
Generator
voltage at 120V
Receptacle
0 % 3780 63.0 125V
50 % 3600 60.0 122V
100 % 3480 58.0 118V
Output voltage should be checked periodically to
ensure continued proper operation of the generating
plant and appliances, it can be checked with a portable
meter. Frequency can be checked by using an electric
clock with a sweep second hand. Timed against a
wrist watch or a stop watch the clock should be correct
within +/- 2 seconds per minute. All speed setting
adjustments should be done by a qualified technician.