PLUMBING PREPARATION
NOTE: Locate the drain overflow so the PVC drain
pipe will not exceed 48Ćinches in length.
Position the plumbing supplies and drain trap
according to the roughingĆin dimensions and the
Custom BodySpa room design. Cap the supplies, and
check for leaks.
INSTALL THE TOWER MOUNTING
FRAME
On one of the tower mounting studs, draw a pencil
line exactly 18Ć5/8Ćinches up from the subfloor.
You will use this mark to temporarily position the
tower mounting frame at the correct height. Be
precise with this measurement.
Remove the three 3/8Ćinch tower bolts from the
locations shown, and carefully lift the tower out of
the mounting frame. Carefully set the tower aside
where it will not be damaged.
Position and level the mounting frame between
the tower mounting studs, and line up the bottom
metal edge with the pencil line you drew on one of
the studs.
Loosely hold the mounting frame to the stud
framing with four of the ten drywall screws
provided. Do not turn the screws all the way in at
this time.
Check Point #2
- Plumbing supplies installed and capped.
- Tower mounting frame bottom edge positioned 18Ć5/8Ćinches
above the subfloor.
- Tower mounting frame loosely mounted to studs.
INSTALL THE PUMP BOX
The pump box contains a 2Ćhorsepower pump and
motor, along with the control box and an integral
heater.
Remove the suction bracket assembly from the pump
box. The suction bracket can later be installed in any
chosen location within 48Ćinches of the pump box.
Fit the pump box between the false wall and face
wall. Locate the pump box to maximize accessibility
and so the pump inlet faces in the direction of your
planned suction line. The pump box must be within
36Ćinches to either side of the tower so the tower and
Waterfall cables will reach to the pump box. Do not
secure the pump box in place at this time.
INSTALLATION