Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS Outdoor Shower User Manual


 
8
STEP 1
Position the wall posts so the edge of the post is set back
3/4" (19 mm) in from the edge of the base
STEP 2
Level both wall posts in their proper position and mark
where screw holes are to be drilled. Drill 3/16" holes and
secure with wall anchors and screws provided. Cut a 12"
strip of tape (provided) and apply firmly over screw
heads.
STEP 3A
Slide straight glass panel all the way into wall post. Mark
position of glass post. Remove panel.
2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
TAPE
6 PLACES)
FINISH WALL
3/4"
(19 mm)
EDGE OF BASE
MARK POSITION
APPLY BEAD OF
SILICONE SEALANT
ON UNDERSIDE OF
BOTTOM BRACKET
CORNER POST
STEP 3B
Apply a bead of silicone sealant on underside of bottom
bracket corner post and place bracket where marked.
Drill pilot holes (#8 screw) and secure bracket to base.
Reinsert panel into wall post and position glass post over
bracket.