Page 65
J-400
13.6 Programming the Secondary Filter Cycle
1. To program the Secondary Filter
cycle, press button C. This cycle
will activate the main jet pump to
run for additional ltration when
programmed (Fiugre S). If you
choose not to use this feature,
please skip this section.
2. When you enter the Secondary Filter
Cycle submenu, the “Day Settings”
will be selected (Figure T). From this
menu, you can set the day, time, and
duration. Press the Splash button on
the Quad Keypad to conrm
selection.
3. You can choose the day(s) you would
like to run a secondary lter cycle
(Figure U). Press the Up or Down
button on the Quad Keypad to scroll
through and change the days you
would like the ltration to run. Press
the Left or Right button to turn “ON”
( ) or “OFF” the ltration for that
day.
4. Press the Splash button to save settings.
5. Press button D to return to the submenu to continue programming
the start time and duration (Figure T).
6. Press the Down button on the Quad
Keypad to select “Start Time” (Figure
V). Press the Left or Right button on
the Quad Keypad to select the time
you wish the spa to lter. Press the
Down button on the Quad keypad to
access the “Duration” setting.
Note: If you are using a standard 12-
hour period, you will see the hour displayed as “1PM”. For the
24-hour period it will read “1300”.
Primary
Secondary
Heating
Press to
reset to default
SETTINGS 2
OFF
Figure S
Figure T
SECONDARY
Start Time
Day Settings
Duration
Select
Day Settings
Press to enter
SECONDARY
Select
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Press to enter
Monday
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Figure U
SECONDARY
Start Time
Day Settings
Duration
Press to save
Select
Start Time
1AM
Figure V