SECTION 5—MAINTENANCE
Part No 1096926 25 Supine Bath Tub
SECTION 5—MAINTENANCE
ƽ WARNING
Before performing any maintenance to the tub, make certain that the electric power
source is shut off to avoid electrical shock.
Be certain ALL electrical work is performed by a qualified electrician and is in
compliance with local codes.
If any part of the system is NOT functioning properly, DO NOT use the system. Have
the system serviced to correct the problem.
The system MUST be maintained on a regular basis to ensure it is functioning properly.
ELECTRICAL SHOCK HAZARD. All disassembly and maintenance of the tub MUST
be done by a qualified technician, certified electrician or plumber.
Disconnect electrical supply or turn OFF circuit breaker before performing any
maintenance to the tub.
Parts Information
NOTE:Forpartsinformation,pleasecontactInv acareContinuingCareGroupTechnical
Serviceat(866)616‐2631.
NOTE:Everysix mont hsoras necessary,haveaqualified t ech nician perform at horoughinspection and
servicing.Routinemaintenancewill extendthelifeandefficiencyofyourtub.
Safety Inspection Checklists
Initially
❑ Ensurethatthemaximumwatersupplytemperaturedoesnotexceed110°F(43°C).
❑ Ensurethatthemaximumwaterpressure doesnotexceed65PSI.
❑ Verifythewaterflowtemperaturewithaseparatethermometer.
❑ V isuallyinspectforcracks inthetubsurface.
❑ Checkthatalllabelsarepresentandlegible.Replace
ifnecessary.
Before Each Use
❑ Disinfectthetub.
❑ Ensurethatthemaximumwatersupplytemperaturedoesnotexceed110°F(43°C).
❑ Ensurethatthemaximumwaterpressure doesnotexceed65PSI.
❑ V isuallyinspectforcracks inthetubsurface.
Every 80-150 Baths
❑ Performtheheavydutycleaningprocedureonthetub.RefertoHeavyDutyCleaning
Procedureonpage 27.