SECTION 4—INSTALLATION
Supine Bath Tub 22 Part No 1096926
Plumbing Hook-Up
ƽ WARNING
Be certain ALL plumbing work is performed by a qualified plumber and is in
compliance with local codes.
NOTE:Forthisprocedure,refertoRefertoFIGURE 4.5.
NOTE:ForinstallationdetailsrefertoPlumbingInstallationonpage 23.
CAUTION
The 2 inch PVC stub MUST be recessed into the floor to make the elbow flush with the
floor. For Model IH6300ADH, this will allow smooth up and down movement of the
hose. Otherwise, drain tubing and fittings could be crushed at low point of
operation.
1. Installtheplumbinghook‐upsperFIGURE 4.5.
FIGURE 4.5 Plumbing Hook-Up
10.0 in
(254 mm)
Cold
Hot
3.5 in
(89 mm)
5.5 in
(140 mm)
6.5 in
(165 mm)
3/4 in. Ball Valve
DETAIL “B” - DRAIN AND ROUGH-IN LOCATIONS
Drain
Elbow
Front of Tub
DETAIL “A” - HOOK UP LOCATIONS
MUST be a
minimum of 6 in
above the floor
6 in.
(152 mm)
Tub
Centerline of Tub
Back of Tub
36 in.
(915 mm)
Wall
Drain
2 in. PVC stub