Image IMSG63120, IMSB63120 Hot Tub User Manual


 
9
5. After a qualified electrician has wired the spa to a
240-volt power source, refer to step 1 on page 8.
Re-attach the Long Access Panel (5). Remove the
two warning decals (not shown) from the spa shell.
Using a damp cloth, wipe the spa shell clean.
Before filling the spa, make sure that it is in the
desired position and that there is room to easily
service the spa. Once the spa is filled, it will
have to be drained before it can be moved.
Using a garden hose or other clean water source, fill
the spa. Do not use soft water. The spa may be
filled with cold water; however, if warm or hot water
is used, the spa will be ready for use sooner. Fill the
spa until the water is at the middle of the skimmer
opening. Do not overfill the spa.
Refer to the inset drawing. Set the Filter (16) into the
filter housing. Next, screw the Filter Cover (8) into
the filter housing until it is fully seated.
3. Refer to the drawing on page 6 and locate the long
access opening. Next, locate the two indicated gate
valves inside the opening. Make sure that the gate
valves are open and that the locking clips are
snapped onto the stems of the gate valves (refer to
the inset drawing in step 2 on page 8).
Make sure that the indicated collars are tightened.
Locate the drain hose inside the opening. Close the
valve knob on top of the drain hose and make sure
that the cap is fully tightened.
4. The hydrotherapy spa operates on a 240-volt power source and must be wired directly to a 40 amp Ground
Fault Circuit Interrupter (GFCI) installed in your home. This procedure must be performed by a qualified
electrician. A wiring diagram is found on the inside of the electronics pack as a reference. Under no
circumstances should the spa be wired by someone other than a qualified electrician. Before you
have the spa wired, make sure that it is in the position you want and that it can be easily serviced, if needed.
6. Pull down one of the straps on the Spa Cover (11)
and hold the Buckle (30) against one of the cedar
panels on the spa. (Note: To position the Buckle cor-
rectly, have a second person hold the strap on the
opposite side of the Spa Cover tight.) The Spa
Cover must be tight. Do not place the Buckle
over the grooves between the cedar slats. Refer
to the inset drawing. Remove the latch from the
Buckle (30). Attach the Buckle to the cedar panel
with two #4 x 3/4” Screws (31).
Attach the other three Buckles (30) to the cedar pan-
els in the same way.
Remove the Spa Cover (11) from the spa.
5
3
Fill to the
middle of
the
Skimmer
Housing
Filter
Housing
Collars
Collars
Gate
Valve
Electronics Pack
Gate
Valve
6
11
30
Strap
Latch
30
31
8
Drain
Hose
Valve
Knob
Cap
Filter
Housing
16
Strap