Husqvarna HCS9, HCS13 Blower User Manual


 
13
ASSEMBLY
18. Remove the discharge chute from the deck.
19. Place the deck plate pin in the tube on the
back edge of the deck. Rotate the blower
around and into place. Figure 3.
20. Install the pin thru the tabs on both the deck
and the blower. Figure 3.
21. Latch the idler arm in the idler keeper.
Figure 3.
22. Install the belt on the deck pulley and
release the idler arm from the keeper.
23. Install the new belt shield.
24. Place the hose on the blower housing and
secure with the over center hose clamp.
DECK PLATE PIN
TUBE
ROTATE
IDLER ARM
IDLER KEEPER
FIGURE 3