Harbor Freight Tools 94515 Greenhouse Kit User Manual


 
Page 6SKU 94515
For technical questions, please call 1-800-444-3353.
FRAME ASSEMBLY
Unless noted otherwise, all frame parts will be attached using the Bolts
(43) and Nuts (52) provided. Bolts should all be assembled with their heads
facing the outside of the greenhouse. Tighten Nuts only about
1
/
4
turn past
finger-tight; be careful not to overtighten.
Lay out all parts by number prior to assembly.
An assistant or an appropriate support (not included) will be useful to keep
the partially assembled parts upright during assembly. An assistant should
be used to assemble the Crown pieces to the rest of the frame.
Assemble on a clear, calm day. Wind may damage the Greenhouse and will
make assembly difficult.
Front Floor
Plate (17)
ground
outside
greenhouse
Base
(57)
Gravel
Rear/Side Floor
Plates (16, 34)
ground
outside
greenhouse
Base
(57, 58)
Gravel
Cross Section
Assembling the Outer Frame
Lay all Floor Plates (16, 17, 34) out on top of the base with the flanges facing the
outside of the greenhouse as shown above. Make sure that the Front Floor Plate
(17) is on the side that you want your door to be located.
There are four Corner Studs (1, 29) to be attached to the Floor Plates (16, 17, 34),
the end with two holes should be at the bottom. As explained below, attach Left-
hand Corner Studs (1) on the outside of the front-left and rear-right corner using
two Bolts each Stud. Attach the Right-hand Corner Studs (29) on the outside of
the two remaining corners, also as explained below.
To attach the corner studs, as shown
to the right: 1) slide a Hold Down
Connector (55) up under the rail and
over the end of the Bolt (43), then 2)
secure it using a Nut (52). Use two
Hold Down Connectors for each Cor-
ner Stud.
1.
2.
55
1 2
1 2
43
55
52
55
1 2
1 2
43
55
52