Operator's ManualThird Edition • Second Printing
Part No. 97600 Genie TML-4000 and TML-4000N 17
Operating Instructions
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was intended.
Fundamentals
The Operating Instructions section provides
instructions for each aspect of machine operation.
It is the operator's responsibility to follow all the
safety rules and instructions in the operator's,
safety and responsibilities manuals.
If more than one operator is expected to use a
machine at different times in the same work shift,
each operator is expected to follow all safety rules
and instructions in the operator's manual. That
means every new operator should perform a pre-
operation inspection, function tests and a work
place inspection before using the machine.
Setup
Make sure the machine is set up according to the
Setup procedure in the Function Tests section.
Starting the Engine
1 Make sure the circuit breaker light switches are
in the off position.
2 At the control panel, turn the key or turn the
switch to the run position. The glow plug light
will come on.
3 Wait for the glow plug light to go off.
4 Turn the key or turn the switch to start.
Note: If the key or switch is not turned to start
within 10 seconds of the glow plug light going off,
the engine may fail to start. If this happens, turn
the key or switch to the off position and repeat the
procedure.
Note: If the glow plug light is flashing during the
preheat cycle, the battery is low.
Operation of Lights
1 Turn on the lights using the circuit breaker
switches located on the control panel. Each
switch corresponds to one of the lamps.
Note: The lights can take up to 20 minutes to reach
full intensity.
Note: If the lights are turned off and turned back on
while they are still warm, they will not light up again
for 20-30 minutes.
2 Turn the lights off by turning the circuit breaker
switches to the off position. Make sure the
lights are turned off before shutting down the
engine.